VELVET

Decorative coating Velvet  decorative coating creates a feeling of delicate, pearly coating of a mat silk on the walls. Patterns created on decorative coating give astonishing effects of play of light and shade. This beautiful decorative coating can surprisingly differs from saturated-compact to fine-delicate. Decorative coating Velvet gives the premises an unusual look and is combined with the cutting edge in interior design. Velvet is a breathable and water resistant paint. Paints can be applied on different pre-treated surfaces such as cement, gypsum, gypsum plasterboard and wood. Decorative coating Velvet, undoubtedly, will add an elegance and atmosphere of luxury to your interior.

Application method

The walls, before applying the decorative plasters, should be qualitatively aligned and plastered.
Before applying the wall must be primed with compositions corresponding to the selected surface. It is desirable to complete the rough work before applying to avoid pollution. The manufacturability of the process must be maintained. Each applied layer must dry for obtaining durability. Under these rules coating becomes durable, high-quality and elegant.
Step 1: prime painting of the surface. Priming – to apply prime on a solid and well-dried basis by roller. Diluting with water up to 30%. The drying time – 8 hours. The surface must be free of roughness and grooves; as well it must be free of scratches.
Step 2: Applying the first layer of decorative coating – apply decorative paint dulated with 30-50% water by the roller. Paint drying time – not less than 4 – 6 hours. Not more than 10% of the paint is used for the application of the first layer, i.e. we pour 10% of the paint into the container and dilute it one to one with water.
Step 3: final layer and smoothing- apply decorative paint with a spatula or roller. After 2-3 minutes to smooth the surface with clean spatula in circular or multi-directional movements without pressure (for the desired effect apply 2-4 times).
* In the application of the first and the second layer it is necessary to wait from 4-8 hours. Drying time: on average: 30-60 minutes, complete drying: 7-14 days, depending on the type of surface.
* If the paint is in several buckets, before using it mix everything in one container.